Chapter 2- Procedure and Documentation for Sanction/ Completion of Building Plans, Section 2.13-Signing of Plans for Submission to Authority/ Concerned Local Body

Signing of Building Plans: All building plans / drawings, before submission to
the Authority/concerned local body, must be signed by the Owner(s), Structural
Engineer AND any one of the following:
a. Architect (for any plot size)
b. Engineer (for plots up to 500 sq. m)
c. Supervisor (for plots upto 200sqm)

2.13.2 Signing Development Permit/ Sub–Division Plan/ Layout Plans: All Development permits/ Sub–Division Plans/ Layout Plans, before submission to
the Authority/ concerned local body, must be signed by the Owner(s) and any one of the following:
a. Town Planner (for any plot size)
b. Architect (for plots up to one hectare in size)